This project saw the ground floor shop area renovated with a new front door, windows, ceiling, and insulation added. On the ground floor, also at the back, old walls were removed, and a new kitchen was added. All the walls were demolished on the first floor, and new wiring, flooring and windows were added alongside a new ceiling with insulation. Also, where three rooms existed, now there is an open-plan floor area. The top floor roof was seriously damaged with a collapsed ceiling; this was repaired, insulation added, and new windows installed.